正规买足球的App

迪尔伯恩公园国际小学

虎鲸南街2820号.
西雅图,华盛顿州98108
关于迪尔伯恩
总部:206-252-6930
传真:206-252-6931

迪尔伯恩公园学校简介

就读地区 考勤区地图 

学校领导和董事会地区

迪尔伯恩公园的社区合作伙伴 Community resources and programs at 迪尔伯恩公园国际小学


学校持续改善计划(C-SIP)

迪尔伯恩公园国际小学C-SIP

The 学校持续改善计划(C-SIP) is an action plan for each school that identifies the areas a school plans to focus on in the current and coming school year, the performance goals they want students to achieve, and how the school plans to collaboratively meet these goals.

The plans are updated regularly to reflect the strategies being used at each school. This document also serves as the school-wide improvement plan for our Title I schools.


学校及楼宇报告

School Report

迪尔伯恩公园国际小学 School Report

School Reports show a brief snapshot of a school’s academic growth, 学生气候, 问责制, 家庭和员工敬业度, 以及学校的整体表现. School reports are produced by the State Office of Superintendent of Public Instruction for each school and district in the state and updated periodically throughout the year as data becomes available.

关于国家评估, 期望参加但没有参加的学生, 比如缺席或选择退出, 被算作非精通. This may affect the school’s overall proficiency rating.

Questions 正规买足球的App报告? 联系研究与评估部门 research@lfkgw.com.

学校气候调查

迪尔伯恩公园国际小学 学校气候调查

学校气候调查s are used for school-level improvements, 所有员工都要接受气候调查, 学生和家庭. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.

建筑历史

迪尔伯恩公园建筑历史和信息

石棉危险紧急反应法(AHERA)

Surveillance of known asbestos in the Dearborn Park building is performed every six months by a designated person to assess the condition of the Asbestos Containing Building Materials (ACBM). Six-month assessment results are maintained by the district.

根据AHERA的要求, 迪尔伯恩公园国际小学 School must maintain an Asbestos Management Plan (AMP) and keep it on file at the school. The AMP is available for review during school hours, Monday through Friday. 如需更多资料,请联络:

温迪时装
环境健康和安全经理
wjcouture@lfkgw.com
206-252-0528


纪律仪表板

作为西雅图卓越计划的一部分, 正规买足球的App战略计划, the district is committed to interrupting disproportionate practices in discipline. To support this work and to increase transparency and 问责制, the district has created and published public facing discipline dashboards for each school which became available on November 1, 2021.

Discipline dashboard data reflects the current school year and will be updated quarterly throughout the school year. For questions or concerns, please reach out to the school leader for a specific school.

Academic Year:当前学年.
访问/违约: Click here to switch to an accessible version of the dashboard.
按月行动: Count of disciplinary actions by month and exclusion type.
Actions: Count of disciplinary actions for an exclusion type.
Attribute: Student Attribute (gender, race/ethnicity, special education served, 504 plan)
Days:排除类型的排除天数.
排斥日:排除天数.
纪律率: Count of students with at least one disciplinary incident divided by count of all enrolled students.
E. Expulsions: Count of emergency expulsions for a student attribute.
Enrolled:在校生总数.
排外行动:排他行为的计数 for a student attribute.
排除天:学生属性的排除天数.
排除类型:短期停牌(SS), 长期停飞(LS), 紧急驱逐(EE), 在校休学(IS), 驱逐(特异), 及临时替代教育环境(IA).
排他的行动:排他行为的计数.
Expulsions:学生属性的开除次数.
FERPA合规: Family Educational Rights and Privacy Act Compliance. *
按星期划分的事件:按星期计算的纪律处分次数.
按级别划分的事故:按年级划分的纪律处分次数.
按小时划分的事故:按小时计算的纪律处分次数.
按排除类别划分的事故:违纪事件数 for an exclusion type.
事件的学生属性或支持服务:违纪事件数. Incidents are counted as many times as there are students involved.
每100名学生的事件数:违纪事件数 divided by enrolled students and then multiplied by 100. Incidents are counted as many times as there are students involved.
Rate:排除类型的惩戒率.
School Name:学校名称.
Students: Count of students with at least one disciplinary incident.
Suspensions:学生属性的停学次数.
Weapons:违纪事件数 in which a weapon was involved.

* Please note: When a group has fewer than 10 enrolled students, all values for at least the two smallest groups are suppressed.

迪尔伯恩公园利维项目

BEX II

利维批准 : 2001

项目描述

This project replaced portables with a new classroom wing and a cafeteria/auditorium.

  • 建筑面积:53,715平方英尺
  • 建筑面积:52,354平方英尺
  • 容量:450名学生(K-5年级)
  • Site Size: 10.3 acres
  • 总成本:7美元.4 million
  • 竣工日期:2006年9月
  • 建筑事务所:Mahlum Architects
  • 承包商:卡塞尔建筑公司

About BEX

The Building Excellence (BEX) Capital Levy funds projects such as those that modernize or replace aging buildings, 资助学生学习的技术, address earthquake and safety issues and major preventive maintenance needs throughout the district.

The $398 million Building Excellence II (BEX II) was approved by Seattle voters in 2001 to replace the expiring BEX I Capital Levy. It paid for renovation or new construction of schools throughout the district.

BTA III

2010年2月, the $270 M, 六年征费, Buildings, 科技及学术III (btaiii), 获得73人支持.45%的人在列维的选举中投票. 这是对建筑物的更新, 技术和体育(BTA II)利维, 于2004年2月由选民通过.

  • 2017 :改善暖气及通风系统.
  • 2011 : Installed second exit door including paved ADA access to meet early childhood education code and safety rules. Installed new sinks in the kitchen and made other safety precaution changes for early childhood education.

BTA II

In 2004, Seattle voters approved the BTA II capital Levy. The Levy funded nearly 700 facility improvement projects and technology upgrades at every school in the district. 

  • 20011 : Replaced boiler burners and made improvements to boiler efficiency.
  • 2009 计算机网络升级为光纤, enhancing students’ and teachers’ ability to use technology as an educational tool.
  • 2007 内部升级,械甲怪. 升级,水线更换

About BTA

The Buildings, Technology and Academics (BTA) Capital Levy supports the district’s long-range plans to upgrade and renovate aging school facilities and address enrollment growth.

The BTA IV Capital Levy was approved by voters in 2016. 正规买足球的App will receive these Levy funds from 2017 through 2022.

在迪尔伯恩公园注册