雷尼尔山海滩

雷尼尔海滩高中 Replacement Project

construction phase graphic showing that the school is in the Construction phase
了解每个项目阶段

The existing 雷尼尔海滩高中 will be replaced with a new high school building on the same site. The construction will be done in phases so the school can remain on campus during the project.

You can contact SPS in your own language through the online feedback form

时间轴

  • 预设计阶段完成
  • 方案设计阶段完成
  • 设计开发阶段完成
  • Construction documents/permitting phase in progress
  • 投标和授予阶段完成
  • Phased construction: April 2022-December 2026
    • 第三期工程正在进行
    • Estimated move into western 70% of new building: January 2025
    • Phase 4, construction of Performing Arts building expected completion June 2026
    • Phase 5, field installation expected completion December 2026.

项目进展

Progress updates are posted for the previous month.

2024年2月的主要活动

  • 钢结构安装完成.
  • Completed concrete slabs on metal decks.
  • Continued to install roofs on the main classroom building and gymnasium.
  • 延续外墙框架, 防火, 内部轻计螺柱安置, 绝缘, 机械, 电, 和管道(MEP)安装.

Major activity planned for March 2024

  • Begin window placement and continue masonry around building perimeter.
  • Continue exterior metal stud framing, sheathing, and waterproofing on the classroom building.
  • 继续防火工作.
  • Continue interior light gauge metal stud framing, 绝缘, and wallboard installation.
  • Continue roofing work on the main classroom building and gymnasium.
  • 继续MEP和洒水车粗修.

Live Webcams and 项目进展 Photos

View the webcams to see the project live.

This slide show shows the project as it proceeds.

a small building inf ront of construction debris and light poles
Phase 2 – Demolition of the grandstands – Summer 2022
a large room with risers has construction debris in the center
Phase 2 – Demolition to create a temporary locker room for use during construction – Summer 2022
construction equipment in front of a building
Phase 2 – Selected demolition of existing buildings – Summer 2022
a truck with a tall drill attached and people working
Phase 1 – Installing geothermal wells for heating and cooling – Summer 2022
a drilling rig stands above a field of dirt covered in straw. 照片里有卡车
Drilling geothermal wells at the existing baseball field – Sept. 2022
a person stands in a trench with a ladder in the trench nearby
Connecting geothermal wells located beneath the future practice field
trucks with tall things attached in a dirt field
Beginning installation of rammed aggregate piers – Oct. 2022
a large frame work is being installed over an area with large rocks
Installing temporary construction tent – Dec. 2022
a tall drill machine with a person in a hard hat stands in a muddy field
Geothermal well installation continues – Dec. 2022
metal forms stand on edge in dirt under a giant tent with lights. construction workers are using equipment
Trenching and rough-in for deep underground utilities – Jan. 2023
yellow mesh covers some areas of a gavel covered ground next to canvas walls
Future location of east 电 room – Feb. 2023
a vast spread of a rebar cage with workers adding more
Rebar is prepared for the concrete slab foundation
concrete mixer trucks lined up on a drive way among mud puddles
42 cement trucks delivered about 415 cubic yards of concrete – April 5, 2023
two cement mixer trucks are backed into openings in a large white tent
Two trucks at a time into the tent – April 5, 2023
a worker in a safety vest and hardhat is smoothing concrete in a large flat area
Concrete must be leveled and smoothed after placement – April 5, 2023
在一个大帐篷下, white waterproofing material has a stack of 电 conduit placed in a guie frame with rebar beneath it
Waterproofing, rebar, and 电 conduit for inside of concrete slab foundation – March 2023
a grid of rebar inside concrete frames 在一个大帐篷下
Preparation for concrete for mat slab 4A – April 2023
workers installing rebar in a pit under a big tent
Placing rebar and utility conduit on the waterproof membrane April 2023
底部是钢筋网格, a group of workers in hardhats and safety vests stands in the center, a concrete pump is in the back with a large tent structure over it all
Pouring additional foundation mat slabs – May 2023
rebar formed into tall grids sits in foreground on top of a white material. 背景是一个大帐篷
Rebar installation for another mat slab for the foundation – May 2023
a crane is lifting a large frame piece from a structure of pipes
Disassembling the construction tent – May 2023
a steel frame is being built on top of a concrete floor. 左边有一只鹤
Steel erection began on the east part of the new school – August 2023
a steel frame has a large delivery trailer in front of it with bent steel on it
Steel erection underway with steel stair sections being delivered – August 2023
steel framing for a building with a crane
Four floors of steel erected; new gym will attach to this structure – Sept. 2023
A building under construction with a few people
Placing concrete slabs on metal decking – Sept. 2023
A group of men in orange vests and helmets working on a construction site
Starting roof on 技术中心 building – Sept. 2023
a four story steel frame for a large building with construction cranes, lifts, and other machines
South side of new 4-story classroom building which will overlook the football field – Oct. 2023
metal framing in progress on a large steel framed building
Exterior metal framing on Skill Center part of classroom building – Oct. 2023
a concrete truck is pumping concrete to the third floor of a steel framed four-story building under construction
Placing concrete on the 3rd floor metal deck – Oct. 2023
a large flat surface has a crane in the background, 工人们四处分散, and a lot of orange construction standards
屋顶上的工作正在进行- 10月. 2023
A building is wrapped in white material with a hole for a door.
Skills center building wrapped in weatherproofing to allow exterior work to continue – Nov. 2023
inside a large building under construction with no walls yet
Installing light gauge metal stud framing and hollow metal door frames – Nov. 2023
two workers in construction safety equipment are on a lift holding green sheets of material against studs
Beginning placement of water resistant wall board – Nov. 2023
a four-story steel frame rises above the soil at a construction site
Classroom building steel structure and metal decks complete – Dec. 2023
a four story frame of building has part of it wrapped in white material at a muddy construction site
Exterior metal stud framing on the north side of the classroom building – Dec. 2023
two workers on a lift are moving green wallboard into place on steel frames on an indoor construction site
石膏墙板安装- 12月. 2023
a concrete floor with steel framing and a view out the side showing it is up high
Fourth floor concrete slab on metal deck complete – Dec. 2023
looking out through structural steel framing with metal studs on a building under construction
Exterior metal framing installation for the gymnasium – Feb. 2024
a large stairway under construction in a building under construction
One of the central stair sections through the atrium – Feb. 2024
a two story interior space under construction with large pipes in the ceiling
Skill Center aerospace metal shop space – Feb. 2024
a room with a window has wallboard that is taped but not painted and construction equipment in the room
First floor classroom prepared for paint primer – Feb. 2024
exterior of a 2, 3, and 4 story building under construction with materials in the foreground
南面向东的景色- 2月. 2024

社区参与

学校设计谘询小组(SDAT)

在设计过程的早期, representatives from the school community come together to form a school’s SDAT. SDATs typically include school and district staff, parents, students, and community members. The project construction managers also take part. Due to the timing of the 雷尼尔山海滩 SDAT, meetings were held virtually. Read more and review the meeting minutes.

A virtual community update about the 雷尼尔海滩高中 project was held on June 16.

项目设计

Architects renderings of the new school

drawing of a large three story building with a walkway leading to it between trees
新增主入口
drawing of a track and field in front on of a large building
田径
a drawing of a site plan that includes a building and playfields
更换工程的地盘平面图
drawing of dining commons with lunch tables
一楼用餐区
large common area with dining tables and stairs; a room with glass windows looking out toward below says LIBRARY
图书馆及公共餐厅
drawing of common area with windows looking out from the floor above
餐厅朝向健身房
drawing of a gym with bleachers and orange and blue accents
体育馆
drawing of a library with bookshelves and seating
图书馆位于二楼
drawing of an open space with seating and a wall mural
3楼东公地
drawing of a walkway with railings that look down to the floor below
4楼公共场所向下看
drawing of a small group area with a room next to it that has blue walls
4楼小团体区
室内走廊的绘图
剧院大堂

项目简介

雷尼尔海滩高中 will be replaced with a new four-story high school of approximately 297,000平方英尺. When completed, it will provide permanent space for 1,600 students grades 9-12. Students will remain on-site during the phased construction. A regional 技术中心 is being incorporated into the project as well as a district data center. The project is being built with aspirations of a LEED Platinum certification.

设计公司: 巴塞蒂建筑事务所/穆迪·诺兰

项目管理公司: 拟基本解

总承包商: Lydig施工

项目预算: $238.2M

资金来源: Funded by the Building Excellence V Capital Levy (BEX V), approved by Seattle voters in 2019 and the Buildings, 技术, and 学者/Athletics V Capital Levy (BTA V), 由西雅图选民于2022年批准.

正规买足球的App

Let’s Talk Comments and Questions Form

拟基本解经理: 保罗•波波维奇 ppopovich@parametrix.com, 253-208-7831

雷尼尔海滩高中
苏厄德公园大道8815号. S
西雅图,华盛顿州98118

学校的网站

学校简介